Applications

Pipeline Infrastructure

For trunk-line operators, CGOT supplies pigging stations and line heaters proven on PipeChina projects — including vacuum heating furnaces for the Jiangsu Binhai LNG feeder pipeline (Binhai–Xuyi) and pig launcher/receiver skids for Shengli Oilfield.

Field Challenges

  • Wax and scale deposits cut pipeline throughput over time.
  • In-line inspection requires safe insertion and retrieval of intelligent pigs.
  • Gas pressure-reduction stations need reliable preheating to avoid hydrate formation.

CGOT Solutions

  1. Launcher and receiver skids with quick-opening closures and automated pressure control.
  2. Vacuum phase-change line heaters for LNG feeder and transmission pipelines.
  3. Valve manifold skids for distribution and emergency shut-down.

Related Products

Request a Quote